8 Red Flags to Check Before Buying a NJ Condo or HOA Home

    The short answer: Before you buy a New Jersey condo or a home in an HOA community, look for eight red flags. They are a thin reserve fund or an out-of-date reserve study, special assessments, open structural repairs, unpaid dues, lawsuits, insurance gaps, rules you can't live with, and a developer still in control. Since 2024, NJ law has required most community associations to undertake and fund a capital reserve study with a proposed 30-year funding plan (N.J.S.A. 45:22A-44.2).

    None of these is automatically a deal-breaker. Each is a question for the seller, the association, your attorney and your lender, ideally during attorney review or your contract's document-review period. The order below is ours. For how condo ownership works, start with condos, co-ops and 55+ communities in NJ.

    1. A thin reserve fund or an old reserve study

    A reserve study estimates what the association will need to repair or replace shared components like roofs and paving, and whether savings are on track. Under P.L.2023, c.214 (approved January 8, 2024), an association must undertake and fund one, and it must include a proposed 30-year funding plan (N.J.S.A. 45:22A-44.2). Associations with less than $25,000 in total common-area capital assets are exempt. For covered buildings (see item 3), the study must be conducted and reviewed at least once every five years (44.2(c)). The goal written into the law is reserves big enough to cover replacements without a special assessment or loan (45:22A-44.3(a)). An underfunded association may have to phase in higher reserve contributions over up to 10 fiscal years (45:22A-44.3(c)).

    Lenders look too: in a full condo project review, Fannie Mae expects the budget to put at least 10% toward replacement reserves (Fannie Mae Selling Guide B4-2.2-02).

    Where to look: the latest reserve study and the current budget's reserve line.

    Ask: "When was the last reserve study, and is the budget following its funding plan?"

    2. A special assessment, passed or on the way

    A special assessment is a one-time or multi-year charge on top of regular fees. For structural repairs to the primary load-bearing system, the board can adopt an assessment or take a loan without owner consent, whatever the governing documents say, once it has a licensed engineer's or architect's report supporting it (N.J.S.A. 45:22A-45a).

    Where to look: board minutes, the budget and any notices sent to owners.

    Ask: "Is any assessment adopted, or being discussed, and who pays installments that come due after closing?"

    3. Open findings from a structural inspection

    Residential condo and co-op buildings whose primary load-bearing system is concrete, masonry, steel or a hybrid are "covered buildings," whatever their height (DCA FAQ). Frame-built construction with combustible walls or roofs is excluded. A covered building needs an initial structural inspection within 15 years of its certificate of occupancy, or within 60 days of observable damage, with catch-up deadlines for older buildings, then follow-up inspections (N.J.S.A. 52:27D-132.4). Reports must spell out required repairs, and they must be made available to any resident on request.

    Where to look: the most recent inspection report and any repair plans filed with the town.

    Ask: the seller, as a resident, to request the latest report for you.

    4. Unpaid dues on the unit, or lots of late payers in the building

    At a sale, the seller and the buyer are jointly and severally liable for the unit's unpaid assessments up to the date of conveyance. A buyer who pays can then recover those amounts from the seller (N.J.S.A. 46:8B-21(c)). Before the sale is complete, a purchaser can ask the association for a certificate of unpaid assessments, due within 10 days ((d)). In a full review, Fannie Mae allows no more than 15% of units to be 60 or more days late on regular fees (B4-2.2-02).

    Where to look: the unpaid-assessment certificate and the delinquency figures your lender's condo questionnaire asks for.

    Ask: "How many units are 60 or more days behind?" Related: title problems that can delay a NJ closing.

    5. A lawsuit involving the association

    Fannie Mae treats a project as ineligible when the association is a party to pending litigation, or when the developer is a party to litigation about safety, structural soundness, habitability or functional use. Some minor matters that don't affect safety or soundness can still qualify (Fannie Mae Selling Guide B4-2.1-03). Other loan programs have their own rules.

    Where to look: the lender's condo questionnaire and board minutes.

    Ask: "Is the association suing anyone, or being sued?"

    6. A gap between the master policy and your own coverage

    A NJ condo association must insure the common elements and structural portions against fire and other broad-form casualty risks, and carry liability coverage for injuries in the common elements (N.J.S.A. 46:8B-14(d), (e)). Owners may buy their own coverage as well ((h)). Whatever the master policy leaves out is the gap you'd fill.

    Where to look: the master policy's declarations and the bylaws' insurance sections.

    Ask: your insurance agent what your own policy needs to cover. Related: 8 costs of owning a NJ home beyond the mortgage.

    7. Rules you can't live with

    A master deed can restrict how units are used, occupied, transferred or leased (N.J.S.A. 46:8B-9(m)). The association can adopt and enforce rules, including reasonable fines if the master deed or bylaws allow them (46:8B-14(c)). Rental limits, pets, parking and exterior changes are common surprises.

    Where to look: the master deed, the bylaws and the current rules and regulations.

    Ask: "Can I rent the unit, and under what conditions?" Related: condo master deeds and bylaws explained.

    8. A developer still in control

    Within 60 days after 75% of the units are conveyed, the developer must give owners control and hand over key records, including plans, warranties, insurance policies and a preventive maintenance document (N.J.S.A. 45:22A-47.1). If you buy directly from a developer, unless the project is exempt, you get a public offering statement and a right to cancel the contract in writing by midnight of the seventh calendar day after signing (N.J.S.A. 45:22A-26).

    Where to look: the public offering statement (new units) or the association's transition records.

    Ask: "Has the developer turned over control, and were the turnover items delivered?"

    This list is general education, not legal advice.

    Business Elementary teaches the 75-hour pre-licensing course required for the NJ salesperson license.

    Last reviewed: November 24, 2026

    Sources

    Frequently Asked Questions